Thursday, December 2, 2021

INTERIOR TRIM

I used a teak and holly EVA foam on the cabin sole, built a bilge pump valve system (you can use any of the manual bilge pumps to pump any bilge), installed the electronics and built a circuit breaker on/off box, ran all the wires and plumbing, installed a head and holding tank in the V berth, and a cool storage step in the companionway. 


Head, Holding Tank, Anchor Storage and a cabin sole











No comments:

Post a Comment